Legal Notice
This report was prepared as a result of work sponsored by the California Energy Commission (Commission). It does not necessarily represent the views of the Commission, its employees, or the State of California. The Commission, the State of California, its employees, contractors, and subcontractors make no warranty, express or implied, and assume no legal liability for the information in this report; nor does any party represent that the use of this information will not infringe upon privately owned rights. This report has not been approved or disapproved by the Commission nor has the Commission passed upon the accuracy or adequacy of this information in this report.
i
Acknowledgements
San Diego Gas and Electric would like to thank Linda Davis, the California Energy Commission Project Manager, for her valuable input, guidance, and encouragement during the entire course of this study.
Participating Individuals
Robin S. Tenoso, Engineer I Linda Kay Dolan, Engineering Analyst Sohrab A. Yari, Manager
ii
iii
TABLE OF CONTENTS
Section Page
Preface ........................................................................................................................................... vi Executive Summary ...................................................................................................................... 1 Abstract .......................................................................................................................................... 5 1.0 Introduction ........................................................................................................................ 7
1.1 The FACTS Technology...
No comments