Vertical Shaft Impact Crusher in the rise of our country for some time, it is a particularly popular, then how to buy Vertical Shaft Impact Crusher, and installation that is usually installed Vertical Shaft Impact Crusher in the plant or open spaceoperations. Stone crushing equipment installation, in accordance with the packing list, inventory, examine the various parts for wear during transport and are complete. Should be installed to the new Sand leveling so that the spindle and horizontal-vertical, the top and sides of the new Vertical Shaft Impact Crusher appropriate space should be left to prepare lifting and repair with.

After the installation is complete, you should still conduct a comprehensive inspection, such as: oil pipe is connected securely. Sand production line equipment test run before attempting to re-add a lubricant, and check whether the connection between the various parts are solid and reliable, if a foreign body in the impeller, the motor wiring is correct. Running, if unusual circumstances should immediately stop operation. This installation will be able to sand production line, the greater the increase the production efficiency of the Vertical Shaft Impact Crusher!

Improve the efficiency of Vertical Shaft Impact Crusher: Vertical Shaft Impact Crusher to maintain regular lubrication, lubrication, dry oil lubrication, the use of Mobil automotive greases premium, the dosage is 1/2-2/3 of the bearing cavity, brokenper, for a group, add the right amount of grease; the boot sequence of the entire system of sand production line for the feed: nesting → ??crusher machine → crusher must be no-load start, before feeding to be the crusher is operating normally, with the full set of production line, according to the different stone and broken the rational allocation of the different requirements of equipment; hands-on training to be a fair operator, is familiar with the third generation Vertical Shaft Impact Crusher operational processes to reduce...