Do You Know How to Install a Jaw Crusher

  • Date Submitted: 06/09/2014 02:32 AM
  • Flesch-Kincaid Score: 51 
  • Words: 359
  • Essay Grade: no grades
  • Report this Essay
Jaw cursher is a common equipment in mining industry. Today we want to introduce the installation of jaw crusher.1 , jaw crusher to be installed in a place where rain can not be exposed to the weather .   2, the motor must be installed in the rear of the crocodile crusher , the direction of rotation must be made ​​in accordance with the requirements may not reverse .   3 , jaw crusher should be fixed in the concrete floor, leaving a row of ground ore trough , its inclination is not less than 50 degrees. According to the foundation by the user in the form of feeder and elm on the equipment .   4 , after adjusting crocodile crusher discharge opening before , you should loosen tension spring , to be adjusted , then adjust the spring tension degree , the extent of the spring tension to be able to eliminate noise between toggle plate and pad appropriate bracket does not fall off at work .   5 , with the jaw crusher and other mining equipment and management , the need is conducive to production, in favor of pipeline operations, to ensure that the face without congestion.   6 , in order to facilitate the transportation of finished materials , access to materials best use of mechanized transportation equipment.   7 , jaw crusher before commissioning the coupling parts and tightening the screws , check lubrication.   8 , first with the human moving pulleys , unimpeded movement of recognition can be empty experiments within two hours may not have the impact , noise, leaking seal between the shaft and pulley loose swing and so on. Bearing temperature should not exceed 35oC, if found above the fault must be immediately stopped for repairs.   9 , in line with the user trial to take 12 hours, and the use of secondary minerals such as no more than a hard failure and bearing temperature does not exceed 70 degrees Celsius, can be put into production.At the present, Fote Heavy Machinery has set up three state level machinery research institutes, and we also produce various kinds of...

Comments

Express your owns thoughts and ideas on this essay by writing a grade and/or critique.

  1. No comments