Words of Wisdom:

"Don't bother people who disike you...proove to them that someday you're going to be something better that them" - Na7as

Something Important About Cement Packing Machine

  • Date Submitted: 07/12/2014 02:33 AM
  • Flesch-Kincaid Score: 53.9 
  • Words: 324
  • Essay Grade: no grades
  • Report this Essay
Cement packing machine has the following features: our cement packing machine has wide adaptability that all the powder and particle materials with good fluidity can be packed by this machine. In addition, this machine can realize the continuous working process of filling, weighing, falling automatically. And the working environment is clean, the machine will not begin to fill until the worker inserts an bag and the bag will not fall until the weight reaches to the setted value. Besides all of these features, our machine is characterized with easy maintenance, less spare parts and no hydraulic and pneumatic components. Last but not least, for cement packing machine with eight to twelve spouts, we can configure cement cleaning machine, bag receiving machine, vibration screen and vibrating feeder.Besides the starting of the equipment, the halt operation is also very important because the improper operation will cause serious results such as the service life of the machine may reduce greatly. The following matters should be paid attention after the halt of the equipment.1. Before the temperature of main engine and main bearing fall to the normal temperature, it is not allowed to stop the lubrication and water cooling system.2. After the grinding mill stops operating, the exhaust gas disposal system should adjust the system pressure according to the condition of the rotary kiln such as the opening of the relay fan.3. After the grinding mill stop operating diesel jaw crusher, the user has to connect the mill to the high pressure lifting device so as to prevent the bearing alloy from damage because of the cooling contraction of the grinding body. Until the grinding body cools to the normal temperature, the user can remove the high pressure lifting device.4. All the valves should be closed after the main engine and auxiliary engine stop operating and the recorder should be also closed in time.hxjq: http://www.sell-mill.com/news/n91.html

Comments

Express your owns thoughts and ideas on this essay by writing a grade and/or critique.

  1. No comments