Words of Wisdom:

"A chicken once had its head cut off and survived for over eighteen months, headless." - Jeffryma

The Replacement Methods of the Cone Crusher Parts

  • Date Submitted: 07/13/2014 05:56 PM
  • Flesch-Kincaid Score: 60.6 
  • Words: 361
  • Essay Grade: no grades
  • Report this Essay
Because of the cone crusher works in a state of 360 degrees rotation cycle overload for long time, after a long time ,each part will inevitably be worn and damaged. If the normal operation of the crusher cannot be guaranteed, it is necessary to replace the broken parts.For this problem,the paper will introduce the replacement methods of the cone crusher parts to you as follows.

The replacement methods of the rolling mortar wall
The u-shaped screw of the rolling mortar wall wards off the adjusting ring, and the zinc-alloy is casted between the crack to make them combine compactly . The new installation or replacement of the rolling mortar wall should be after 6-8 hours of work. Fote heavy machinery alerts the operators that they should check the fastening condition strictly and tighten the u-shaped screw again.

The replacement methods of the cone crushing wall
Firstly,insert an iron rod into the hole at the top of the spindle sleeve, and then contrarotate the spindle sleeve with a sledge at full tilt until it is unscrewed.Secondly, when removing the spindle sleeve ,you may encounter the difficulties,you need to cut the cutting ring under the spindle sleeve to reduce the pressure on the screw thread.Pay special attention not to damage the spindle, and rotate the spindle sleeve easily.Finally ,hang the worn crushing wall from the body, and put on the new crushing wall.

The replacement methods of the liner brushing
Because of the changing of the cylinder bushing and the frame body of the cone crusher , in order to prevent the liner brushing from rolling ,you should cast the zinc folded gold into the upper slot of the liner brushing .The cone sleeve should fit the eccentric shaft strictly, and the zinc alloy is casted to prevent the sleeve from rotating.The zinc alloy should fill all the clearances,because the hot-zinc alloy may cause the deformation of the taper bushes, after the new cone sleeve is installed,you should check the size ,if it is found...

Comments

Express your owns thoughts and ideas on this essay by writing a grade and/or critique.

  1. No comments