Bsop 429 Production Activity Control and Just-in-Time with Lab

  • Date Submitted: 10/10/2015 01:30 AM
  • Flesch-Kincaid Score: 67.2 
  • Words: 1713
  • Essay Grade: no grades
  • Report this Essay
BSOP 429 Production Activity Control and Just-in-Time with Lab
http://homeworkfy.com/downloads/bsop-429-production-activity-control-and-just-in-time-with-lab/

BSOP 429 Production Activity Control and Just-in-Time with Lab

BSOP 429 Week 1 Written Assignment
BSOP 429 Week 1 Discussion 1 How Other Levels of OPC Affect PAC (graded)
BSOP 429 Week 1 Discussion 2 Compare and Contrast JIT and MRP (graded)
BSOP 429 Week 2 Written Assignment
BSOP 429 Week 2 Lab 1 of 6: The Scheduling Lab
BSOP 429 Week 2 Discussion 1 Lead Times (graded)
BSOP 429 Week 2 Discussion 2 Lab 1 Discussion (graded)
Q & A Forum for your questions and comments (not graded)
BSOP 429 Week 3 Written Assignment
BSOP 429 Week 3 Lab 2 of 6; Lab Scheduling
BSOP 429 Week 3 Discussion 1 Types of Constraints (graded)
BSOP 429 Week 3 Discussion 2 Lab 2 Discussion (graded)
BSOP 429 Week 4 Written Assignment
BSOP 429 Week 4 Lab 3 of 6; Scheduling, Reporting and Feedback
BSOP 429 Week 4 Discussion 1 PAC Feedback (graded)
BSOP 429 Week 4 Discussion 2 Lab 3 Discussion (graded)

BSOP 429 Week 4 Midterm Exam (2 Versions)

BSOP 429 Week 4 Midterm – Set 1

1. (TCO 12) _____ is the objective under JIT and time-based competition. (Points : 5)
2. (TCO 2) Which of the following lead-time elements can be compressed into one well-designed PAC system? (Points : 5)
3. (TCO 3) What happens to inventory as the number of kanban cards increases? (Points : 5)
4. (TCO 1) In managing supplier relations, which of the following is a beneficial setup? (Points : 5)
5. (TCO 6) When linking marketing requirements and manufacturing strategy, what design approaches for shop floor system should be considered? (Points : 5)
6. (TCO 9) Which of the following is true? (Points : 5)
7. (TCO 4) According to Elyahu Goldratt, the TOC system uses a scheduling approach called _____. (Points : 5)
8. (TCO 5) The amount of time covered by the basic MRP record is called the _____. (Points : 5)
Page 2
1. (TCO 1) Please...