Words of Wisdom:

"And I beheld, and lo a black horse; and he that sat on him had a pair of balances in his hand." - Majora

Bsop 429 Week 8 Final Exam - Updated 2014

  • Date Submitted: 10/18/2015 01:58 AM
  • Flesch-Kincaid Score: 66.6 
  • Words: 1113
  • Essay Grade: no grades
  • Report this Essay
BSOP 429 Week 8 Final Exam - Updated 2014



IF You Want To Purchase A+ Work Then Click The Link Below   , Instant Download

http://acehomework.com/BSOP-429-Week-8-Final-Exam-Updated-2014-111116777.htm?categoryId=-1

If You Face Any Problem E- Mail Us At   JohnMate1122@gmail.com




BSOP 429 Week 8 Final Exam - Set 1
• Page 1
1. (TCO 4) The priority rule, which will sequence jobs in the order they are received, is _____. (Points : 5)

2. (TCO 2) In an assignment method problem, if it takes Abe 3 hours to build a birdhouse and 4 hours for a doghouse, and Betty takes 4 hours for a birdhouse and 3 hours for a doghouse, what is the reduced cost (in hours) of assigning Betty to build the doghouse? (Points : 5)

3. (TCO 2) A major difference between manufacturing and service systems in terms of scheduling is (Points : 5)

4. (TCO 3) Scheduling in service systems may involve scheduling which of the following?(Points : 5)

5. (TCO 5) The owner and operator of the local franchise of Handyman, Inc., has four jobs to do today, shown in the order they were received:

6. (TCO 6) Building up an inventory of standard parts or modules instead of immediately producing the finished end items is the essence of (Points : 5)

7. (TCO 7) With regard to suppliers, JIT systems typically require (Points : 5)

8. (TCO 10) Which of the following is characteristic of the JIT philosophy? (Points : 5)

9. (TCO 1) In make-to-stock systems, fluctuations in sales volume are managed through which of the following? (Points : 5)

10. (TCO 5) In an MRP master schedule, the planning horizon is often separated into a series of times periods called (Points : 5)
• Page 2
1. (TCO 8) Explain how cellular manufacturing represents a flexible manufacturing system. (Points : 25)

2. (TCO 11) State the four building blocks of lean operations, and explain how fast and simple are the two common threads that run through them. (Points : 25)

3. (TCO 9) Elaborate on the...

Comments

Express your owns thoughts and ideas on this essay by writing a grade and/or critique.

  1. No comments