The sand making machine to create cement tiles and red brick comparable
    load test: (1) jaw crusher continuous operation 2h, the the bearings temperature rise should not exceed 30 鎺?C. (2) Jaw Crusher All fasteners should be firm, without loosening. (3) the flywheel, the smooth operation of the sheave. (4) The the Jaw Crusher friction parts no abrasions, crumbs and grinding phenomenon, no unusual noise. (5) Jaw Crusher nesting population adjustment device should be able to ensure that the adjustment range of discharge opening.Load test run: (1) crusher shall cycle or significantly impact crash. (2) The maximum feed size should meet the design requirements. (3) continuous operation of 8 hours, the the bearings temperature rise should not exceed 30 鎺?C. (4) the processing capacity of the crusher and product size should meet the design requirements. (5) Adjust the seat and rack ears Block asked no obvious traverse.Preparations before use: (1) carefully check the connection of the thrust plate at whether there is enough grease. (2) Carefully check all fasteners are tightened. (3) Carefully check drive belt is good, insecurity, should be replaced when the oil slick on the drive belt or pulley applications rag to wipe the oil spill. (4) Check whether the guards found insecurity, should be immediately removed. (5) Check whether the ore crushing cavity or debris, if ore or debris must be cleaned up,rock crusherRotary dryerjaw crusher to ensure that the crusher cavity starts. (

  6) Check the top bolt is returned Gaskets pressed T-bolts are tightened.Jaw crusher start: (1) The inspection proved the normal situation in various parts of the machine, before they start. (2) jaw crusher machine is only allowed in the   alicey599 case of no-load start. (3) before the start, ringtones or signal must be forewarned. (4) after the start, if not normal, should stop immediately.Not normal to be identified and excluded only after the restart crusher.The production and use of the...

Comments

Express your owns thoughts and ideas on this essay by writing a grade and/or critique.

  1. No comments