Words of Wisdom:

"Boys do have feelings, but like "who cares"!" - Jod

How to Operate a Stone Crusher

  • Date Submitted: 12/10/2013 11:26 PM
  • Flesch-Kincaid Score: 64.1 
  • Words: 436
  • Essay Grade: no grades
  • Report this Essay
While there are so many kinds of stone crushers for different size of products, various factors should be taken care of are separately unlike. However some regular principles like working inspections before is necessary for all stone crushers even all equipment in the construction. Regular check on the vibration of the connections and the size of raw materials are all crucial to avoid break the machine. And drive belt is also important: too loose or too tight are both not allowed.

At the beginning, the installment of the stone crusher has to be paid attention. As same, the careful examination is inevitable. Check if there is a well-prepared lubricating bearing, bearing the connection and enough oil. All the transmission belts and wheels should be normal and all of the fastening has to be completely fixed. This part is actually vital. It will cause great damage if there is something wrong. To check if the protection equipment are perfect and ready to work, and if all the index are in a regular way to shown on the instrument. And the rock crushing chamber or other debris should be removed before operating the machine. For broken crusher with abnormal conditions, they should never be launched until it passes the further security test.

Start and close the stone crusher with the right button in right order. There is no need to emphasize in that everybody get the importance and the consequence if not. But I want to remind you that some crushers can produce various sizes of projects. So if you use this kind of machine, make sure the quality you need and then arrange the data of output and input materials. Feed the materials and check if it needs more timely. Wrong sizes of the materials shouldn’t be put into the crusher. Neither do the wrong type of materials. Some of the crushers require the materials fed in it can’t be wet. Then continuous checking if the working condition of every part of the machine is going right well. If not, stop it immediately to recheck...

Comments

Express your owns thoughts and ideas on this essay by writing a grade and/or critique.

  1. No comments