Words of Wisdom:

"They say you shouldnt throw stones if you live in a glass house, if you got a glass jaw you better watch your mouth..." - JakeSteel

Is It Necessary to Check Before Starting Briquette Press

  • Date Submitted: 07/12/2014 12:41 AM
  • Flesch-Kincaid Score: 58.6 
  • Words: 426
  • Essay Grade: no grades
  • Report this Essay
Mineral powder briquette machine, which is also known as mineral powder briquette making machine, can be used to suppress coal powder, iron powder, coking coal, Aluminum powder, scrap iron, iron oxide skin, carbon powder, slag, gypsum, tailings, sludge, kaolin, activated carbon, coke breeze and various other powder, powder material, waste and residue, And Is It Necessary to Check Before Starting this type Briquette machine Press?

We Should check the electric parts is normal before starting mineral powder briquette making machine. Check two roller die for no, such as wrong is, open the gear cover, loosen the passive gear on the adjusting plate on six screws, positive and negative rotation passive roller makes the roller die when that is, to tighten the screws as well.Work roll spacing should be kept between 0.4 to 0.7 mm, if you are too bigger than the small, can loosen the passive roller, bearing and wire drawing, adjusted, after set, tighten the screws and wire drawing.Started production of finished products, after check on the double roller face to cooperate, if appear error, can tear down in the big gear cover, loosen the passive roller gear to adjust the outer screw.




2, check electrical work of mineral powder briquette making machine is normal, type roller and hydraulic pressure mercury to forward.To check for two roller die, two roller pressure ball machine spacing should be between 0.4 0.7 mm, too big too small should be adjusted.If wrong two roller die is open gear cover, loosen the passive gear adjustment plate on six screws, positive or reverse rotation adjustment, adjustable just after the screw tightly.If two roller spacing is big or small should be passive (active) the four on both sides of the shaft and the driving wheel side is to be adjusted on silk, after everything is ok, machine oil should be combined with reducer.The hydraulic oil and hydraulic mercury the casing.Boot pressure testing, says 11 mpa pressure controller in the bottom of...

Comments

Express your owns thoughts and ideas on this essay by writing a grade and/or critique.

  1. No comments