Words of Wisdom:

"I am a novice. Please give me your advise how to writte an essay" - Aimanmirza

On the Safe Operation of the Boiler Crusher

  • Date Submitted: 12/17/2013 03:29 AM
  • Flesch-Kincaid Score: 39.4 
  • Words: 309
  • Essay Grade: no grades
  • Report this Essay
For the safe operation of the crusher in the coal dryer section shall be equipped with magnetic separator to remove coal iron . Capacity vibrating screen ,powder making process for dolomite
crusher and coal machine should match each other , and fully meet the needs of coal consumption .
Coal hopper coal crushing machine given away by a good cinder coal bucket each boiler plant . Coal hopper capacity should normally ensure that the boiler is running at rated load. Coal hopper shape , now almost all square or rectangular cross-section , there are blocking coal and coal under the problem of uneven . raymond mill for dolomite
The best use of circular cross-section and lower coal scuttle coal pipe .
Dust dust pollution than the circulating fluidized bed boiler furnace chain , pulverized coal is more serious , because coal crushing finer due. Thus , in the coal crusher stations and corridors must be set dedusting system .
Limestone Preparation : For the circulating fluidized bed desulfurization using limestone , limestone and coal preparation system supply system should be a unified set . Limestone particle size range typically O-2mm, usually purchased by the market, people can take advantage of the coal handling system for the boiler plant limestone bucket . Limestone, coal bucket by bucket volume calculation method to determine the volume should be set to a dedicated feeder conveyor furnace limestone .
Design and selection of air circulating fluidized bed with the ignition system , including primary air required for wind , secondary air , coal stoker sowing the wind , wind and returning materials ignition glib wind , but the wind amount of each of the wind , the wind pressure is different, so it 's air supply system is more complex. Each style is usually provided by a boiler designers give it away position , marble mobile crusher in turkey
wind, air pressure , air supply designers and design accordingly select the fan air supply system .

Comments

Express your owns thoughts and ideas on this essay by writing a grade and/or critique.

  1. No comments