As the project duration is required, the concrete mixing station rainy days as usual construction. Rainy day construction, must do the following guarantee and protection measures.Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:mobile block making machine,concrete batching plants,concrete mixer,blocking making machine,concrete pump,etc.   Mixing station construction site should have flood control, drainage systems and measures, the road should be kept clear electric portable concrete mixer, to prevent the phenomenon of road congestion and road slip. The drainage ditch excavation, tank systems should be, and should always check the stability of the stirring station wall, avoid earthwork slump. After brushing the template, the template should be covered to prevent the rain washed; if the isolation agent is found to be washed, should be re painted, the square of the concrete. Cement mixer shed and shed should be regularly checked to prevent leaks. Sand, stone water content should be measured frequently, and should be deducted from the amount of water added in the mix. Mixing station to transport raw materials and concrete in rainy days, should be covered. Before pouring the concrete, the water should be drained in the die. Mixing station open structure and components if the requirements of continuous construction without construction joints, should generally be a fortification canopy. You should prepare enough cover waterproof materials (such as tarpaulin, linoleum, etc.) so as to cover, to prevent rain erosion. If the surface of the component should be re washed by the rain, smooth light pressure. The slope, Ma should take anti-skid measures. Mixing station of electric machinery and electrical wires, should always check whether the electrical leakage; found leakage, should immediately stop work to repair.

Comments

Express your owns thoughts and ideas on this essay by writing a grade and/or critique.

  1. No comments