Words of Wisdom:

"a good man is not so easily found." - Essaygeek.

Is Internet a Bless or a Curse

  • Date Submitted: 10/09/2010 11:26 PM
  • Flesch-Kincaid Score: 75.3 
  • Words: 293
  • Essay Grade: no grades
  • Report this Essay
INVOICE

TO                                                                                                                                 Bill No: 038
The Chief Manager                                                                                                     Date:     21/9/10
Indian Overseas Bank
GAD, Central Office
Chennai

SUB: Submission of bill
Ref: Painting works at flat no.114 Chidambaram Gardens, sterling  
        Road, nungambakkam,Chennai-34                                

We are pleased to submit here with our bill for the above refered work as below  

S.No DESCRIPTION OF WORK QTY UNIT RATE AMOUNT  
    In Rs
1 Painting the ceiling with single coat(without patches) of OBD paint of approved brand and shade after thoroughly scrapping the surface and washing the dirt off before application of fresh paint, as directed by Bank. The cost to include for touch up putty and scaffolding. 1732.25 Sq.ft 2.50 4330.62
2 Painting the internal walls of the flat with single coat (without patches) of OBD paint of approved shade and brand , after thoroughly scrapping loose paint as necessary, including touch up putty etc. all complete 4015.19 Sq.ft 2.50 10037.97
3 Painting the doors, windows, grills etc. with one coat of enamel paint approved brand (viz, Berger) after through preparation of the surface all neat and complete. 2525.37 Sq.ft 3.00 7576.11
4 Through Cleaning of the falt including all room floors, window glass, electrical fittings, acid wash for the toilets and cleaning of wall tiles etc. All neat and complete. lumpsum lumpsum 3000 3000.00
5 Painting the internal walls of the flat with extra single coat (without patches) of OBD paint of approved shade and brand , after thoroughly scrapping loose paint as necessary, including touch up putty etc. all complete 1850.00 Sq.ft 2.50 4625.00
                                                                                                                                      Total...

Comments

Express your owns thoughts and ideas on this essay by writing a grade and/or critique.

  1. No comments